ACORN® Insight

Keep up-to-date on the latest product and company news, along with useful information for the maintenance, repair and overhaul industry.

Our insight tagged with 'Case Study'

CASE STUDY: A Fast-Track Coupling Solution for Pump Rental Company

When a critical pump was out of action for a leading UK pump rental company, extended downtime meant money lost

CASE STUDY: Chain Solution for Cereal Manufacturer

During a routine visit to a national food manufacturer on the Wirral, Business Development Manager, Lee Dobson was approached by an Engineering Manager regarding a critical issue affecting production

CASE STUDY: Preventing Catastrophic Downtime in 24/7 FMCG Production with Custom Solutions

A leading FMCG (Fast Moving Consumer Goods) company in the toilet roll production sector faced a critical challenge that threatened their 24/7 production line.

CASE STUDY: ACORN Helps Food Manufacturer with Lubrication Compliance

When a food manufacturing site in Kirkcaldy, which holds an impressive BRC AA+ rating, faced a crucial challenge: ensuring that its lubricant usage aligned fully with the BRC Global Standard for Food Safety (Issue 9), they weren’t sure where to turn

CASE STUDY: ACORN Solves Lubrication Woes for Medical Waste Recycling Plant

When a prominent recycling company that processes medical waste, approached ACORN due to persistent issues with bearing failure, they were determined to prevent persistent unplanned downtime.

CASE STUDY: ACORN Saves Local Distillery from Coupling Failure Catastrophe

When faced with a critical coupling failure on a Saturday, Phil Mclaughlin sprang into action to get them back up and running.

CASE STUDY: Fife Branch Help Local Biomass Plant with Major Turbine Oil Change

A local Biomass plant reached out when they urgently needed to change out 1,500 litres of oil, having never previously changed the turbine oil.

CASE STUDY: Out-of-Hours Service Saves Local Sand & Gravel Quarry from an Unexpected Gearbox Failure

Business Development Manager, Craig Tivey received the call Friday afternoon and had the plant up and running with a new custom gearbox by Sunday evening.

CASE STUDY: Mapro Hire range saves a maintenance job with minimal wait time

Acorn's South West branch were recently able to save a customers repair job by delivering the correct alginment tool within 1 hour.

CASE STUDY: Identifying essential parts for Recycling plant

Our Power Transmission Product Manager was able to identify specific belt on a recycling plants wood shredding machine.

Categories

Popular tags

View all tags