ACORN® Insight

Keep up-to-date on the latest product and company news, along with useful information for the maintenance, repair and overhaul industry.

Our insight categorised as 'Case studies'

CASE STUDY: Fife Branch Help Local Biomass Plant with Major Turbine Oil Change

A local Biomass plant reached out when they urgently needed to change out 1,500 litres of oil, having never previously changed the turbine oil.

CASE STUDY: Out-of-Hours Service Saves Local Sand & Gravel Quarry from an Unexpected Gearbox Failure

Business Development Manager, Craig Tivey received the call Friday afternoon and had the plant up and running with a new custom gearbox by Sunday evening.

CASE STUDY: Mapro Hire range saves a maintenance job with minimal wait time

Acorn's South West branch were recently able to save a customers repair job by delivering the correct alginment tool within 1 hour.

CASE STUDY: Identifying essential parts for Recycling plant

Our Power Transmission Product Manager was able to identify specific belt on a recycling plants wood shredding machine.

CASE STUDY: Helping to prevent chain failure for bakery customer

A bakery customer was experiencing excessive downtime due to chain failure on their packaging machine, see how ACORN solved their issue...

ACORN revs up to provide cost savings through linear repair services

When a Reliability Manager was looking to generate a repair strategy to create a sustainable work stream, ACORN came in to provide a full repair service while providing a 19% cost saving!

New bearing solution leads to extra cake

Andy Fletcher, ACORN's Bearing & Product Manager undertakes a process line mapping exercise to assess where improvements could be made at a leading manufacturer of baked goods.

CASE STUDY: Saving a leading electrical engineer precious downtime with consignment stock.

Acorn provides value added services that save leading electrical engineers an estimated £23,060.

CASE STUDY: Cutting lead times and providing cost saving alternatives for local asphalt plant

A local asphalt plant were able to cut their downtime significantly by switching to Timken Type-E TRB Units

Fife branch provide long lasting Coupling solution

Regional Manager, Phil Mclaughlin and our Couplings & Drives division cut downtime for linoleum manufacturing plant by 75%.

Categories

Popular tags

View all tags